Geothermal Supply of Exzenterhaus in Bochum

Project Participants:

Prof. Dr. R. Bracke (HS Bochum)
Dipl.-Geophys. G. Bussmann (HS Bochum)
Dipl.-Ing. (FH) Katja Winkler (HS Bochum)
Dipl.-Ing. (FH) Timm Eicker (HS Bochum)


Exzenterhaus Bochum GmbH Co. KG

With the building project “Exzenterhaus“ at the Universitätsstraße in Bochum the existing landmarked round bunker is going to be transformed into a high-rise office building. Therefore a trinomial new building with 15 stories is build on top of the 25 m high bunker. During the conception of the technical equipment for the building concentration lay on energetic characteristics and an innovative concept for heating and cooling of the building through concrete-core-activation, pre-warming and pre-cooling via ventilating systems and static heaters.

For the office rental space of 5.560m² a heating load of 660KW and a cooling load of 450KW was estimated. A part of this load (basic load) shall be provided for by a combination of concret-core-activation and ventilation systems.

Within the feasibility study were

  • The boundary conditions for the technical feasibility (topography, urban building boundary conditions, regulatory approval) established.
  • The operating time dependent on the feasibility data estimated.
  • The geological, hydrogeological and thermo-dynamic basics up to depths of around 400m established.
  • The geothermal ground heat exchanger field for different depths level modelled.
  • The technical system for geothermal energy provision and allocation designed.

This rough dimensioning provides the planning criteria for a continuative assessment period within the approval- and building planning which will be accomplished from January 2009 on.

Zusätzliche Information

Land-use plan for the ground plot of Exzenterhaus
Energy distribution at Exzenterhaus

Jetzt bookmarken

google.comlive.comdigg.comMister Wong